I have been doing some non-broadcast-related consulting work lately. It is actually sort of fun and pays well.  One thing that I have become involved in is solar installations, or more precisely data communications from solar installations.

It seems that a critical part of any solar installation is the production numbers.  Owners/investors like to see a return on investment.  They like to know that their system is working properly.  Getting hard data on electricity production is an important part of the customer service aspect for a solar installation company.  Being able to remotely monitor the system and be alerted of any faults or failures helps keep those production numbers where they should be.

Solar installation on a large fuel storage tank:

Thin film solar panels installed on a fuel storage tank
87.5 KW Thin film solar panels installed on a fuel storage tank

It turns out that those fuel storage tank facilities use a lot of electricity. Not just for the fuel transfer pumps, some of their product is heavy oil; #4, #6, Resid or bunker oil is very thick (or viscous). Tanks, pipes, and pumps for those distillates must be heated to certain temperatures in order to move them. That is all done with electric resistance heating.

There is a very good book about oil and how it is extracted, transported, refined, and used called Oil 101 by Morgan Downey.  It is an eye-opening read, to be sure.

Looking at the tops of those tanks; there is a lot of unused areas.  It is a novel idea to use that area to generate power for the tank farm.  The thin film solar panels come in rolls. They have an adhesive backing and are peel-and-stick. The nice part about this type of installation; the steel tanks help keep the panels slightly cooler, which boosts their production on hot summer days.

Three phase solar inverters installed on fuel storage tank
Three phase solar inverters installed on fuel storage tank

In this installation, each inverter reports to a website that logs all of the output data, as well as area temperature and percentage of sunlight. This system helps the installation company and tank owner know if there are any problems with the array.  In order for that to work, the LAN needs to be set up and a communication device used to connect to the public network.

All in all, that was a fun project.

By the way, if anyone needs a solar system installed, I know a company that can do it.

Happy New Year!

After a bit of reflection and a few good conversations over the New Year’s Holiday, I decided that I should continue my work on this blog.  I would like to thank all those that have stuck by and waited.  I have received numerous emails and messages offline, all of which have been read and appreciated.

Since the abrupt stoppage last July, which was absolutely necessary for me, many things have happened within the business.  Fortunately, during the hiatus, I was still taking pictures.  After sorting through them, here are a few interesting things that happened:

At one of our client’s AM transmitter sites in Albany, NY a 2.6 Million Watt solar system has been installed.

WROW-AM Steel mounting poles on antenna array field
WROW-AM Steel mounting poles on antenna array field

This project required many steel mounting posts to be driven into the ground around the AM towers.  I don’t even know how many, but I would hazard a guess of over three hundred.  Each one of those mounting posts was hand-dug down a depth of 6-10 inches to look for ground wires.  Where ever a ground wire was found, it was moved out of the way before the post was set.

WROW-AM ground wire moved out of way
WROW-AM ground wire moved out of way

Basically, the solar array covers about 1/2 of the antenna array field.  All of the steel mounting hardware is tied into the ground system, making, what I am sure is a pretty large above-ground counterpoise.

WROW-AM solar panel mounting hardware
WROW-AM solar panel mounting hardware

View from the south looking north:

Solar Array installed on WROW antenna array, Glenmont, NY
Solar Array installed on WROW antenna array, Glenmont, NY

View from the north, outside of the transmitter building, looking south:

Solar Array installed on WROW antenna array, Glenmont, NY

Power company interface and disconnect:

Solar Array utility company disconnect, Glenmont, NY
Solar Array utility company disconnect, Glenmont, NY

The utility company had to upgrade the transmission lines to the nearest substation to handle the additional power produced by the solar system. All in all, it was a fun project to watch happen.

At a certain studio building, which is over 150 years old, the roof needed to be replaced.  This required that the 3.2-meter satellite dish and non-penetrating roof mount be moved out of the way while that section of the roof was worked on.

3.2 meter satellite dish

Dish was ready to move, and all of the concrete ballast was removed and taken down from the roof.  The roofing contractors constructed a  caddy and the entire dish and mount were slid forward onto the area in front of it.  Since the front part of the roof was not reinforced to hold up the satellite dish, we did not ballast the mount and the XDS receivers ran off of the streaming audio for a couple of days until the dish was put back in its original position.

3.2 meter satellite dish ready to move
3.2 meter satellite dish ready to move

A couple of other studio projects have been underway in various places.  Pictures to follow…

One of our clients sold their radio stations to another one of our clients.

There has also been a bankruptcy of a major radio company here in the good ol’ US of A.  Something that was not unexpected, however, the ramifications of which are still being decided on in various board rooms.  One of the issues as contractors is whether or not we will get paid for our work.  All things considered, it could be much worse.

Learned a valuable lesson about mice chewed wires on generator battery chargers.  I noticed that the battery charger seemed to be dead, therefore, I reached down to make sure the AC plug was in all the way.  A loud pop and flash followed and this was the result:

Arc burns, right hand
Arc burns, right hand

My hand felt a bit warm for a while.  The fourth digit suffered some minor burns.  There is at least one guy I know that would be threatening a lawsuit right now.  Me, not so much…  All of the high voltage stuff we work on; power supplies that can go to 25 KV, and a simple 120 VAC plug is the thing that gets me.

The return of the rotary phase maker.

Rotary phase maker, Kay Industries T-10000-A

Mechanically derived 3rd phase used when the old tube type transmitter cannot be converted to single phase service.

Those are just a few of the things I have been working on.  I will generate some posts on current projects underway.  Those projects include a 2 KW FM transmitter installation, another studio project, repair work on a Harris Z16HD transmitter, etc