{"id":9679,"date":"2018-06-22T12:03:38","date_gmt":"2018-06-22T16:03:38","guid":{"rendered":"http:\/\/www.engineeringradio.us\/blog\/?p=9679"},"modified":"2023-03-19T09:26:29","modified_gmt":"2023-03-19T13:26:29","slug":"installing-a-satellite-dish","status":"publish","type":"post","link":"https:\/\/www.engineeringradio.us\/blog\/2018\/06\/installing-a-satellite-dish\/","title":{"rendered":"Installing a satellite dish"},"content":{"rendered":"<p>This is a replacement dish for the Comtech dish destroyed in a <a href=\"https:\/\/www.engineeringradio.us\/blog\/2018\/05\/wind-damage\/\" target=\"_blank\" rel=\"noopener\">downburst<\/a> event a few weeks ago.\u00a0 The first part of the job entailed the placement of the new dish on the ground.\u00a0 The town code enforcement officer was much happier with this idea than mounting it up above roof level along the back of the building as the old one was.\u00a0 Of course, this is possible due to the <a href=\"https:\/\/www.engineeringradio.us\/blog\/2017\/06\/engineering-radio-the-satellite-reaiming-tour-2017\/\" target=\"_blank\" rel=\"noopener\">shift in satellites<\/a> last year to AMC-18.<\/p>\n<p>Finding a good spot on the radio station property was fairly easy.\u00a0 The studio is located in a business district, thus the sideyard requirements were zero feet, which is great.\u00a0 The building inspector required that we dig a test hole to see what type of soil was there.\u00a0 It turned out to be fill.\u00a0 That required the footing design to be changed somewhat and stamped by a licensed engineer.\u00a0 Not a major problem.<\/p>\n<figure id=\"attachment_9689\" aria-describedby=\"caption-attachment-9689\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180611_111341981_HDR-e1529359335799.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-9689\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180611_111341981_HDR-e1529359335799.jpg\" alt=\"Satellite mount pole, waiting pre-pour inspection\" width=\"1200\" height=\"900\" \/><\/a><figcaption id=\"caption-attachment-9689\" class=\"wp-caption-text\">Satellite mount pole, waiting pre-pour inspection<\/figcaption><\/figure>\n<p>The footing is 36 inches wide by 7 feet deep.<\/p>\n<figure id=\"attachment_9690\" aria-describedby=\"caption-attachment-9690\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180611_111326169-e1529359310219.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-9690\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180611_111326169-e1529359310219.jpg\" alt=\"A little bit of water in the bottom of the hole\" width=\"1200\" height=\"900\" \/><\/a><figcaption id=\"caption-attachment-9690\" class=\"wp-caption-text\">A little bit of water in the bottom of the hole<\/figcaption><\/figure>\n<p>The mounting pipe has flanges welded to the side of it to prevent it from spinning in the concrete.<\/p>\n<figure id=\"attachment_9688\" aria-describedby=\"caption-attachment-9688\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180618_072441917_HDR-e1529359352563.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-9688\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180618_072441917_HDR-e1529359352563.jpg\" alt=\"Footing poured and cured\" width=\"1200\" height=\"900\" \/><\/a><figcaption id=\"caption-attachment-9688\" class=\"wp-caption-text\">Footing poured and cured<\/figcaption><\/figure>\n<p>After the pour, we let the concrete set up over the weekend.<\/p>\n<figure id=\"attachment_9687\" aria-describedby=\"caption-attachment-9687\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180618_110648322_HDR-e1529359372729.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-9687\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180618_110648322_HDR-e1529359372729.jpg\" alt=\"New dish bolted together\" width=\"1200\" height=\"900\" \/><\/a><figcaption id=\"caption-attachment-9687\" class=\"wp-caption-text\">New dish bolted together<\/figcaption><\/figure>\n<p>The dish is assembled and waiting for lift.\u00a0 We used a backhoe to lift the dish onto the mounting pole, unfortunately, I was not able to take a picture as I was on a ladder attaching the dish to the pedestal with U-bolts.<\/p>\n<figure id=\"attachment_9695\" aria-describedby=\"caption-attachment-9695\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180619_145955390_HDR-e1529682852725.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-9695\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180619_145955390_HDR-e1529682852725.jpg\" alt=\"Viking 1374-990 3.7 Meter R\/O dish installed \" width=\"1200\" height=\"900\" \/><\/a><figcaption id=\"caption-attachment-9695\" class=\"wp-caption-text\">Viking 1374-990 3.7 Meter R\/O dish installed<\/figcaption><\/figure>\n<p>Here it is installed and aimed at AMC-18. I used the Satellite Buddy, which makes the aiming job much easier. Once the signal is acquired, I like to peak the Eb\/No on the West Wood One carrier, which seems to be the most sensitive to any type of change.<\/p>\n<figure id=\"attachment_9694\" aria-describedby=\"caption-attachment-9694\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180619_145407537_HDR-e1529683027533.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-9694\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/06\/IMG_20180619_145407537_HDR-e1529683027533.jpg\" alt=\"Viking 1374-990 3.7 Meter satellite dish, back view\" width=\"1200\" height=\"900\" \/><\/a><figcaption id=\"caption-attachment-9694\" class=\"wp-caption-text\">Viking 1374-990 3.7 Meter satellite dish, back view<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>This is a replacement dish for the Comtech dish destroyed in a downburst event a few weeks ago.\u00a0 The first part of the job entailed the placement of the new dish on the ground.\u00a0 The town code enforcement officer was much happier with this idea than mounting it up above roof level along the back &hellip; <a href=\"https:\/\/www.engineeringradio.us\/blog\/2018\/06\/installing-a-satellite-dish\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Installing a satellite dish<\/span><\/a><\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[131],"class_list":["post-9679","post","type-post","status-publish","format-standard","hentry","category-tech-stuff","tag-satellite"],"_links":{"self":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts\/9679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/comments?post=9679"}],"version-history":[{"count":6,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts\/9679\/revisions"}],"predecessor-version":[{"id":11091,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts\/9679\/revisions\/11091"}],"wp:attachment":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/media?parent=9679"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/categories?post=9679"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/tags?post=9679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}