{"id":9541,"date":"2018-01-08T16:53:52","date_gmt":"2018-01-08T20:53:52","guid":{"rendered":"http:\/\/www.engineeringradio.us\/blog\/?p=9541"},"modified":"2023-03-19T09:33:37","modified_gmt":"2023-03-19T13:33:37","slug":"happy-new-year-2","status":"publish","type":"post","link":"https:\/\/www.engineeringradio.us\/blog\/2018\/01\/happy-new-year-2\/","title":{"rendered":"Happy New Year!"},"content":{"rendered":"<p>After a bit of reflection and a few good conversations over the New Year&#8217;s Holiday, I decided that I should continue my work on this blog.\u00a0 I would like to thank all those that have stuck by and waited.\u00a0 I have received numerous emails and messages offline, all of which have been read and appreciated.<\/p>\n<p>Since the abrupt stoppage last July, which was absolutely necessary for me, many things have happened within the business.\u00a0 Fortunately, during the hiatus, I was still taking pictures.\u00a0 After sorting through them, here are a few interesting things that happened:<\/p>\n<p>At one of our client&#8217;s <a href=\"http:\/\/www.timesunion.com\/news\/article\/WROW-AM-wants-to-build-solar-farm-under-radio-11046129.php\" target=\"_blank\" rel=\"noopener\">AM transmitter sites in Albany, NY<\/a> a 2.6 Million Watt solar system has been installed.<\/p>\n<figure id=\"attachment_9546\" aria-describedby=\"caption-attachment-9546\" style=\"width: 650px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9546\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/solar-mounts-650x488.jpg\" alt=\"WROW-AM Steel mounting poles on antenna array field\" width=\"650\" height=\"488\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/solar-mounts-650x488.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/solar-mounts-150x113.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/solar-mounts-300x225.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/solar-mounts-768x576.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/solar-mounts-400x300.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/solar-mounts.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-9546\" class=\"wp-caption-text\">WROW-AM Steel mounting poles on antenna array field<\/figcaption><\/figure>\n<p>This project required many steel mounting posts to be driven into the ground around the AM towers.\u00a0 I don&#8217;t even know how many, but I would hazard a guess of over three hundred.\u00a0 Each one of those mounting posts was hand-dug down a depth of 6-10 inches to look for ground wires.\u00a0 Where ever a ground wire was found, it was moved out of the way before the post was set.<\/p>\n<figure id=\"attachment_9548\" aria-describedby=\"caption-attachment-9548\" style=\"width: 650px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9548\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-ground-650x488.jpg\" alt=\"WROW-AM ground wire moved out of way\" width=\"650\" height=\"488\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-ground-650x488.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-ground-150x113.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-ground-300x225.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-ground-768x576.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-ground-400x300.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-ground.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-9548\" class=\"wp-caption-text\">WROW-AM ground wire moved out of way<\/figcaption><\/figure>\n<p>Basically, the solar array covers about 1\/2 of the antenna array field.\u00a0 All of the steel mounting hardware is tied into the ground system, making, what I am sure is a pretty large above-ground counterpoise.<\/p>\n<figure id=\"attachment_9549\" aria-describedby=\"caption-attachment-9549\" style=\"width: 650px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9549\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Solar-project-650x488.jpg\" alt=\"WROW-AM solar panel mounting hardware\" width=\"650\" height=\"488\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Solar-project-650x488.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Solar-project-150x113.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Solar-project-300x225.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Solar-project-768x576.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Solar-project-400x300.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Solar-project.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-9549\" class=\"wp-caption-text\">WROW-AM solar panel mounting hardware<\/figcaption><\/figure>\n<p>View from the south looking north:<\/p>\n<figure id=\"attachment_9558\" aria-describedby=\"caption-attachment-9558\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9558\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array-650x433.jpg\" alt=\"Solar Array installed on WROW antenna array, Glenmont, NY\" width=\"650\" height=\"433\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array-650x433.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array-150x100.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array-300x200.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array-768x512.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array-400x267.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><\/a><figcaption id=\"caption-attachment-9558\" class=\"wp-caption-text\">Solar Array installed on WROW antenna array, Glenmont, NY<\/figcaption><\/figure>\n<p>View from the north, outside of the transmitter building, looking south:<\/p>\n<figure id=\"attachment_9559\" aria-describedby=\"caption-attachment-9559\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9559\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1-650x433.jpg\" alt=\"\" width=\"650\" height=\"433\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1-650x433.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1-150x100.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1-300x200.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1-768x512.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1-400x267.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array1.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><\/a><figcaption id=\"caption-attachment-9559\" class=\"wp-caption-text\">Solar Array installed on WROW antenna array, Glenmont, NY<\/figcaption><\/figure>\n<p>Power company interface and disconnect:<\/p>\n<figure id=\"attachment_9560\" aria-describedby=\"caption-attachment-9560\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9560\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2-650x433.jpg\" alt=\"Solar Array utility company disconnect, Glenmont, NY\" width=\"650\" height=\"433\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2-650x433.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2-150x100.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2-300x200.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2-768x512.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2-400x267.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/WROW-solar-array2.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><\/a><figcaption id=\"caption-attachment-9560\" class=\"wp-caption-text\">Solar Array utility company disconnect, Glenmont, NY<\/figcaption><\/figure>\n<p>The utility company had to upgrade the transmission lines to the nearest substation to handle the additional power produced by the solar system. All in all, it was a fun project to watch happen.<\/p>\n<p>At a certain studio building, which is over 150 years old, the roof needed to be replaced.\u00a0 This required that the 3.2-meter satellite dish and non-penetrating roof mount be moved out of the way while that section of the roof was worked on.<\/p>\n<figure id=\"attachment_9551\" aria-describedby=\"caption-attachment-9551\" style=\"width: 650px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9551\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Oneonta-dish-650x488.jpg\" alt=\"\" width=\"650\" height=\"488\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Oneonta-dish-650x488.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Oneonta-dish-150x113.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Oneonta-dish-300x225.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Oneonta-dish-768x576.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Oneonta-dish-400x300.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Oneonta-dish.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-9551\" class=\"wp-caption-text\">3.2 meter satellite dish<\/figcaption><\/figure>\n<p>Dish was ready to move, and all of the concrete ballast was removed and taken down from the roof.\u00a0 The roofing contractors constructed a\u00a0 caddy and the entire dish and mount were slid forward onto the area in front of it.\u00a0 Since the front part of the roof was not reinforced to hold up the satellite dish, we did not ballast the mount and the XDS receivers ran off of the streaming audio for a couple of days until the dish was put back in its original position.<\/p>\n<figure id=\"attachment_9552\" aria-describedby=\"caption-attachment-9552\" style=\"width: 650px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9552\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/oneonta-dish1-650x488.jpg\" alt=\"3.2 meter satellite dish ready to move\" width=\"650\" height=\"488\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/oneonta-dish1-650x488.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/oneonta-dish1-150x113.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/oneonta-dish1-300x225.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/oneonta-dish1-768x576.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/oneonta-dish1-400x300.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/oneonta-dish1.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-9552\" class=\"wp-caption-text\">3.2 meter satellite dish ready to move<\/figcaption><\/figure>\n<p>A couple of other studio projects have been underway in various places.\u00a0 Pictures to follow&#8230;<\/p>\n<p>One of our clients sold their radio stations to another one of our clients.<\/p>\n<p>There has also been a bankruptcy of a major radio company here in the good ol&#8217; US of A.\u00a0 Something that was not unexpected, however, the ramifications of which are still being decided on in various board rooms.\u00a0 One of the issues as contractors is whether or not we will get paid for our work.\u00a0 All things considered, it could be much worse.<\/p>\n<p>Learned a valuable lesson about mice chewed wires on generator battery chargers.\u00a0 I noticed that the battery charger seemed to be dead, therefore, I reached down to make sure the AC plug was in all the way.\u00a0 A loud pop and flash followed and this was the result:<\/p>\n<figure id=\"attachment_9553\" aria-describedby=\"caption-attachment-9553\" style=\"width: 650px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9553\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/ouch-650x488.jpg\" alt=\"Arc burns, right hand\" width=\"650\" height=\"488\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/ouch-650x488.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/ouch-150x113.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/ouch-300x225.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/ouch-768x576.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/ouch-400x300.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/ouch.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><figcaption id=\"caption-attachment-9553\" class=\"wp-caption-text\">Arc burns, right hand<\/figcaption><\/figure>\n<p>My hand felt a bit warm for a while.\u00a0 The fourth digit suffered some minor burns.\u00a0 There is at least one guy I know that would be threatening a lawsuit right now.\u00a0 Me, not so much&#8230;\u00a0 All of the high voltage stuff we work on; power supplies that can go to 25 KV, and a simple 120 VAC plug is the thing that gets me.<\/p>\n<p>The return of the rotary phase maker.<\/p>\n<figure id=\"attachment_9555\" aria-describedby=\"caption-attachment-9555\" style=\"width: 650px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9555\" src=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker-650x488.jpg\" alt=\"\" width=\"650\" height=\"488\" srcset=\"https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker-650x488.jpg 650w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker-150x113.jpg 150w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker-300x225.jpg 300w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker-768x576.jpg 768w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker-400x300.jpg 400w, https:\/\/www.engineeringradio.us\/blog\/wp-content\/uploads\/2018\/01\/Rotary-phase-maker.jpg 1200w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><\/a><figcaption id=\"caption-attachment-9555\" class=\"wp-caption-text\">Rotary phase maker, Kay Industries T-10000-A<\/figcaption><\/figure>\n<p>Mechanically derived 3rd phase used when the old tube type transmitter cannot be converted to single phase service.<\/p>\n<p>Those are just a few of the things I have been working on.\u00a0 I will generate some posts on current projects underway.\u00a0 Those projects include a 2 KW FM transmitter installation, another studio project, repair work on a Harris Z16HD transmitter, etc<\/p>\n<p>It is good to be back!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After a bit of reflection and a few good conversations over the New Year&#8217;s Holiday, I decided that I should continue my work on this blog.\u00a0 I would like to thank all those that have stuck by and waited.\u00a0 I have received numerous emails and messages offline, all of which have been read and appreciated. &hellip; <a href=\"https:\/\/www.engineeringradio.us\/blog\/2018\/01\/happy-new-year-2\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Happy New Year!<\/span><\/a><\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[18,243,64,131,315],"class_list":["post-9541","post","type-post","status-publish","format-standard","hentry","category-general","tag-am-transmitter-site","tag-fm-tansmitter-site","tag-generator","tag-satellite","tag-solar"],"_links":{"self":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts\/9541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/comments?post=9541"}],"version-history":[{"count":10,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts\/9541\/revisions"}],"predecessor-version":[{"id":11098,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/posts\/9541\/revisions\/11098"}],"wp:attachment":[{"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/media?parent=9541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/categories?post=9541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineeringradio.us\/blog\/wp-json\/wp\/v2\/tags?post=9541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}